TGM Trapezium Grinder Mill
TGM super pressure trapezium mill — upgraded grinding system for higher output, finer product and lower power than R-type mills. Ask for a quote today.
View specifications
Manufactured in-house
Photographed at our Zhengzhou works — optional equipment may be shown.
Two-compartment cement ball mill for clinker, slag and blended cements, open or closed circuit, high grinding efficiency. Ask for a quote and spec sheet.
The cement Ball Mill is a two-compartment tube mill sized for clinker grinding. Coarse grinding in the first chamber uses large balls and step liners; fine grinding in the second uses small balls and classifying liners, so the mill delivers a full cement fineness in a single pass through the tube.
Clinker, gypsum and additions are proportioned onto the mill feed and enter the first chamber, where impact grinding reduces them to about 1 mm. A partition diaphragm transfers the material to the second chamber for attrition grinding. Product leaves through the discharge trunnion and is air-classified in a separator when the circuit is closed.


Grinding of Portland and blended cement, slag cement, raw meal and industrial minerals, in plants from 200 to 5 000 t/d clinker capacity, either as a stand-alone grinding station or integrated with a kiln line.


Figures refer to standard configurations. Custom feed size, voltage and liner material available on request.
| Model | Dia.×length (m) | Speed (r/min) | Ball load (t) | Capacity (t/h) | Power (kW) |
|---|---|---|---|---|---|
| Φ2.4×13 | 2.4×13 | 20.4 | 38 | 30–36 | 800 |
| Φ2.6×13 | 2.6×13 | 19.5 | 46 | 40–48 | 1 000 |
| Φ3.0×13 | 3.0×13 | 18.5 | 68 | 55–65 | 1 600 |
| Φ3.2×13 | 3.2×13 | 17.8 | 78 | 65–78 | 2 000 |
| Φ3.8×13 | 3.8×13 | 16.5 | 110 | 95–115 | 2 500 |
| Φ4.2×13 | 4.2×13 | 15.6 | 150 | 130–155 | 3 550 |
Every unit is assembled and run under load before dispatch, with a signed test report and photo record.
Foundation plan, load data, wiring diagram and utility requirements, issued in DWG and PDF.
Our supervisor attends erection and start-up, then trains your operators on site for 7–14 days.
One year of recommended spares shipped in the same container, plus a two-year replenishment plan.
Capacity, fineness and power consumption confirmed in the contract and verified at start-up.
Video and data review within 4 working hours for any operating issue during the warranty period.
Tell us the throughput you need (t/h), the feed size and the finished mesh. We will size the Cement Ball Mill for your duty and return a quotation with drawings within one working day.