Henan Bellian Mining Machinery
Home/ Solutions/ Aggregate & Sand/ Process route
Aggregate & Sand · Process route

600 t/h Granite and Basalt Aggregate Plant

Reviewed 2026-11-27 Bellian Process Engineering

Hard-rock aggregate plant for granite and basalt at 600 t/h, built around laminated cone crushing so blow bars and liners last 40% longer than an impact circuit.

600 t/h Granite and Basalt Aggregate Plant

Granite and basalt are where impact crushers stop making economic sense. Both run 12-18% silica with an abrasion index two to three times that of limestone, so a blow bar set that survives nine months in limestone is finished in ten weeks here. This 600 t/h plant uses laminated cone crushing throughout the secondary and tertiary stages and produces the same four graded fractions at a lower cost per tonne.

Capacity600 t/h
Max feed700 mm
CrushingJaw + 2 cone stages
Products0-5 / 5-10 / 10-20 / 20-31.5 mm

Why not impact crushing

The instinct when building a granite plant is to copy a limestone layout. It usually works for six months and then the maintenance bill arrives. On basalt with an abrasion index above 0.35, impact crusher blow bars wear through the hardfacing in 6-9 weeks at 600 t/h. Cone crushers wear on a manganese liner with 14-18% Mn, which costs a quarter as much per tonne of throughput and can be turned in a shift rather than replaced.

The trade-off is product shape. A cone produces 12-18% flaky particles on a 3:1 reduction, an impact crusher 6-9%. For concrete aggregate that rarely matters; for railway ballast or chip seal it does, which is why many hard-rock plants finish with a vertical shaft impactor instead of a third cone.

Process flow

Vibrating feederJaw crusherPre-screenSecondary coneTertiary coneFinal screenStockpiles

Primary

A ZSW-600x180 feeder with a 100 mm grizzly bypass feeds the PE-1000x1200 jaw crusher at 150 mm close side. On granite this gives 0-220 mm at 600 t/h with a 160 kW drive. The grizzly bypass is not optional on hard rock: passing the minus 100 mm fraction around the crusher adds roughly 90 t/h of effective capacity and stops the chamber from packing.

Secondary

Two HPT300 cone crushers run in parallel, each taking 300 t/h at a 32 mm close side. Parallel units rather than one large unit is a deliberate choice for a 600 t/h plant: when a liner needs changing, the plant keeps running at half rate instead of stopping for a day.

Tertiary and screening

Tertiary is a third HPT300 in fine chamber at 12 mm close side, fed only with the oversize from the pre-screen. Two 3YKR-2460 screens make the final cuts. On basalt we specify polyurethane on the 5 mm deck and rubber on the coarser decks, because steel mesh work-hardens and then cracks at the welds within a season.

Equipment list

StageEquipmentQtyPower
FeedingZSW-600x180 vibrating feeder12 x 37 kW
PrimaryPE-1000x1200 jaw crusher1160 kW
SecondaryHPT300 cone crusher, standard chamber22 x 250 kW
TertiaryHPT300 cone crusher, fine chamber1250 kW
Screening3YKR-2460 vibrating screen22 x 45 kW
ConveyingB1000 belt conveyor, 520 m9196 kW
Dust controlDMC-400 pulse jet filter215 kW

Installed power 1,405 kW, running draw about 1,120 kW, or 1.9 kWh per tonne of finished aggregate.

Wear cost, which is the real number

On basalt at 600 t/h a cone plant consumes roughly 0.9 kg of manganese per hour across all three crushers, at a cost of about USD 0.11 per tonne of product. The equivalent impact circuit burns USD 0.32 per tonne in blow bars. Over 4,000 operating hours a year that difference is worth more than the capital cost gap between the two layouts.

Site requirements

The plant needs a 95 x 50 m footprint on level ground, or a two-bench layout where the jaw sits 12 m above the cones and the stockpiles sit below. Foundation load under the jaw peaks at 4.8 t/m2. Water is used only for dust suppression at roughly 10 m3 per day.

Questions we are asked before quoting

Can the plant handle wet or sticky feed?

Granite quarries in tropical regions often deliver 4-6% moisture in the wet season. Above 5% the 5 mm deck will blind. The fix is a heated deck on the fine screen, or a covered stockpile and a short retention time, not a larger screen.

What if my basalt is more abrasive than the sample suggests?

We test for Los Angeles abrasion and the micro-Deval value before fixing the chamber geometry. Above a micro-Deval of 18 we move the tertiary to a vertical shaft impactor and accept the higher power draw in exchange for 30% longer liner life.

How long from order to production?

Fourteen weeks manufacturing, five to seven weeks erection with our supervisor on site, then two weeks of ramp-up to nameplate.

Other solution categories

Same engineering team, different process route.

Send your material. We will send the flow sheet.

Feed size, moisture, target capacity and product spec are enough to start. Quotations and plant layouts are free and usually back within one working day.

Request a flow sheet WhatsApp us