Aggregate & Sand · Process route

Highway and Railway Ballast Aggregate Line

Reviewed 2026-11-27 Bellian Process Engineering

Aggregate for base course, asphalt and railway ballast, where the governing numbers are flakiness index, Los Angeles abrasion and a grading envelope that must not drift.

Highway and Railway Ballast Aggregate Line

Road and rail aggregate is bought against a specification, not a price. A base course that fails the grading envelope gets rejected at the weighbridge however cheap it was, and ballast that fails the Los Angeles abrasion limit gets rejected after it has already been laid. This line is arranged around holding three numbers steady: flakiness index, abrasion loss and the grading curve.

Capacity250-400 t/h
Flakiness< 15% (ballast < 12%)
LA abrasion< 30%
ProductsBase, asphalt, ballast

Three specifications, three different problems

Base course wants a well-graded 0-31.5 mm with enough fines to bind, and the risk is excess dust. Asphalt aggregate wants single-sized, cubical chips with a tight tolerance on the 10-20 mm cut, and the risk is flakiness. Railway ballast wants 31.5-63 mm with sharp edges and a high crush resistance, and the risk is breakage during handling. A single plant can serve all three but the screen arrangement has to be different for each.

Process flow

FeederJaw crusherPre-screenCone or impactVSI shapingMulti-deck screenWashing (optional)

Primary and secondary

A PE-900x1200 jaw reduces run-of-quarry rock to 150 mm. Secondary is a PF-1315 impact crusher on limestone or a HPT300 cone on hard rock; the choice is decided by the abrasion index of your deposit, and we test it before fixing the layout.

Shape correction

For asphalt and ballast a VSI in shaping mode runs on the 10-20 mm and 20-40 mm fractions only, at low reduction ratio. This is not a crushing duty; the VSI is there to knock the corners off flaky particles and it costs about 1.2 kWh per tonne to do it. Without this stage a cone-only plant typically lands at 18-22% flakiness, which fails an asphalt specification of 15%.

Screening for ballast

Ballast needs a heavy-duty screen, not a standard one. A 3YKR-2460 with a reinforced deck and 10 mm polyurethane panels handles the 63 mm top cut at 250 t/h. The key detail is the discharge chute: ballast breaks when it free-falls more than 1.5 m, so the stockpile conveyor has a cascade chute rather than a straight drop.

Equipment list

StageEquipmentQtyPower
FeedingZSW-490x110 feeder12 x 22 kW
PrimaryPE-900x1200 jaw crusher1132 kW
SecondaryPF-1315 impact crusher1200 kW
ShapingVSI5X-9532, shaping mode12 x 200 kW
Screening3YKR-2460 heavy deck22 x 45 kW
ConveyingB800 / B1000 belt conveyor10165 kW

Quality control that actually works

Three checks per shift are enough if they are the right three. Flakiness index on the 10-20 mm cut by sieve and caliper, grading on a stack of sieves, and a wash test for material passing 75 microns. A plant that runs these three checks will catch drift before the customer does. What does not work is testing the stockpile once a week — by then the rejected load has already gone out.

Questions we are asked before quoting

Can one plant make both ballast and asphalt chips?

Yes, with a screen arrangement that allows the 63 mm deck to be bypassed. The changeover takes about two hours, so most operators run ballast on one shift and asphalt chips on the next.

What is the rejection risk on flakiness?

With VSI shaping the plant holds 10-13% reliably. Without it, 18-22%, which fails most asphalt specifications. The shaping stage is not optional if asphalt is your market.

Other solution categories

Same engineering team, different process route.

Send your material. We will send the flow sheet.

Feed size, moisture, target capacity and product spec are enough to start. Quotations and plant layouts are free and usually back within one working day.

Request a flow sheet WhatsApp us