TGM Trapezium Grinder Mill
TGM super pressure trapezium mill — upgraded grinding system for higher output, finer product and lower power than R-type mills. Ask for a quote today.
View specifications
Manufactured in-house
Photographed at our Zhengzhou works — optional equipment may be shown.
Cement vertical mill — roller grinding with an integrated high-efficiency classifier and low specific power. Send your material for a quote and sizing.
The cement vertical mill grinds clinker and slag on a rotating table with rollers, using the material bed itself as the grinding medium. Drying, grinding, classification and transport happen in one vessel, so the footprint and the specific power are both lower than a Ball Mill circuit of the same output.
Material is fed to the centre of the table and moves outward under centrifugal force into the roller path. Hot gas from the kiln or a hot-air generator dries the bed as it is ground. The air sweeps the fines upward into a dynamic classifier at the top of the mill; coarse particles are rejected back to the table and finished cement leaves with the gas to a bag filter.


Cement and slag grinding in grinding stations and integrated plants, raw meal preparation, and the grinding of limestone, fly ash, pozzolana and blended cement additions.


Figures refer to standard configurations. Custom feed size, voltage and liner material available on request.
| Model | Capacity (t/h) | Fineness (cm²/g) | Table dia. (mm) | Power (kW) |
|---|---|---|---|---|
| HRM2200 | 45–55 | 3 200–4 200 | 2 200 | 1 100 |
| HRM2800 | 65–80 | 3 200–4 200 | 2 800 | 1 600 |
| HRM3400 | 95–120 | 3 200–4 200 | 3 400 | 2 500 |
| HRM4200 | 150–180 | 3 200–4 500 | 4 200 | 4 000 |
| HRM4800 | 200–240 | 3 200–4 500 | 4 800 | 5 600 |
Every unit is assembled and run under load before dispatch, with a signed test report and photo record.
Foundation plan, load data, wiring diagram and utility requirements, issued in DWG and PDF.
Our supervisor attends erection and start-up, then trains your operators on site for 7–14 days.
One year of recommended spares shipped in the same container, plus a two-year replenishment plan.
Capacity, fineness and power consumption confirmed in the contract and verified at start-up.
Video and data review within 4 working hours for any operating issue during the warranty period.
Tell us the throughput you need (t/h), the feed size and the finished mesh. We will size the Cement Vertical Mill for your duty and return a quotation with drawings within one working day.