Rotary Kiln
Rotary kiln for calcining cement clinker, lime, dolomite and bauxite — variable speed, sealed ends, waste-heat recovery. Ask for a quote and delivery.
View specifications
Manufactured in-house
Photographed at our Zhengzhou works — optional equipment may be shown.
Five-stage cyclone preheater with precalciner for dry-process cement kilns — lower fuel consumption, stable kiln operation. Ask for a quote and spec sheet.
The five-stage preheater transfers heat from the kiln exhaust to the raw meal in suspension, so the meal enters the rotary kiln already calcined to about 90 %. The result is a kiln that can be shorter, that runs at higher output for the same shell size, and that recovers most of the heat that would otherwise leave through the stack.
Raw meal is fed at the top and falls against rising hot gas in each stage. In every cyclone the meal is separated from the gas and dropped into the next stage, while the gas moves upward. A precalciner fired with coal or alternative fuel sits between the kiln riser and the lowest cyclone, completing calcination before the meal reaches the kiln inlet.


Dry-process cement and lime kiln lines from 1 000 to 10 000 t/d, and the conversion of long wet or dry kilns into short preheater kilns.

Figures refer to standard configurations. Custom feed size, voltage and liner material available on request.
| Model | Stages | Capacity (t/d) | Cyclone dia. (mm) | Tower height (m) |
|---|---|---|---|---|
| BL-PH1000 | 5 | 1 000 | 1 800 | 42 |
| BL-PH2000 | 5 | 2 000 | 2 400 | 52 |
| BL-PH3000 | 5 | 3 000 | 2 900 | 58 |
| BL-PH5000 | 5 | 5 000 | 3 700 | 68 |
| BL-PH8000 | 5 | 8 000 | 4 600 | 78 |
Every unit is assembled and run under load before dispatch, with a signed test report and photo record.
Foundation plan, load data, wiring diagram and utility requirements, issued in DWG and PDF.
Our supervisor attends erection and start-up, then trains your operators on site for 7–14 days.
One year of recommended spares shipped in the same container, plus a two-year replenishment plan.
Capacity, fineness and power consumption confirmed in the contract and verified at start-up.
Video and data review within 4 working hours for any operating issue during the warranty period.
Tell us the throughput you need (t/h), the feed size and the finished mesh. We will size the Five-stage Preheater for your duty and return a quotation with drawings within one working day.