TGM Trapezium Grinder Mill
TGM super pressure trapezium mill — upgraded grinding system for higher output, finer product and lower power than R-type mills. Ask for a quote today.
View specifications
Manufactured in-house
Photographed at our Zhengzhou works — optional equipment may be shown.
Rod mill for coarse grinding, ore prep and sand making — steel rods as media give a uniform product with little over-grinding. Request a quote and layout.
The MBY rod mill is a horizontal cylindrical mill that uses steel rods instead of balls as the grinding media. Because the rods make line contact with the charge rather than point contact, the product is more uniformly ground and less over-crushed, which makes the rod mill the preferred first stage in two-stage grinding circuits and in manufactured sand plants.
The shell rotates at a speed slightly below critical, lifting the rod charge until it cascades and rolls over the ore bed. Ore is fed through the trunnion at the feed end, travels the length of the shell and discharges by overflow or by grate at the opposite end. The rod charge keeps a flat, parallel grinding face, so the top size of the product is tightly controlled and slimes are minimised.


Rod mills are used ahead of Ball Mills in mineral dressing plants, for primary grinding where a tightly sized feed is required, for wet and dry preparation of industrial minerals, and as the sand-producing unit in manufactured sand lines where a cubical, low-slime product is wanted.


Figures refer to standard configurations. Custom feed size, voltage and liner material available on request.
| Model | Shell size (mm) | Effective volume (m³) | Rod load (t) | Power (kW) | Capacity (t/h) |
|---|---|---|---|---|---|
| MBY0918 | 900×1800 | 1.0 | 1.6 | 22 | 0.8–3 |
| MBY1224 | 1200×2400 | 2.4 | 4.0 | 45 | 2–6 |
| MBY1530 | 1500×3000 | 5.0 | 8.0 | 75 | 4–10 |
| MBY1836 | 1836×3600 | 9.0 | 14.0 | 130 | 8–20 |
| MBY2136 | 2100×3600 | 14.0 | 22.0 | 210 | 15–35 |
| MBY2736 | 2700×3600 | 24.0 | 38.0 | 400 | 30–70 |
Every unit is assembled and run under load before dispatch, with a signed test report and photo record.
Foundation plan, load data, wiring diagram and utility requirements, issued in DWG and PDF.
Our supervisor attends erection and start-up, then trains your operators on site for 7–14 days.
One year of recommended spares shipped in the same container, plus a two-year replenishment plan.
Capacity, fineness and power consumption confirmed in the contract and verified at start-up.
Video and data review within 4 working hours for any operating issue during the warranty period.
Tell us the throughput you need (t/h), the feed size and the finished mesh. We will size the Rod Mill for your duty and return a quotation with drawings within one working day.