Reviewed 2026-11-27 Bellian Process Engineering

Smelter slag still holds 0.8-1.5% copper. Crushing, grinding and flotation recover 90-95% of it, and the tailings then become a saleable abrasive and ballast.

Copper Slag Recovery and Beneficiation Line

Every tonne of copper concentrate smelted produces two to three tonnes of slag carrying 0.8-1.5% copper. At a copper price above 8,000 USD per tonne, that slag is a 100 USD per tonne ore body sitting next to the smelter, already mined, already crushed by the furnace, and free of mining cost. Slow-cooled slag is also coarsely crystalline, which means the copper minerals have grown into grains that liberate easily.

Capacity200-1,000 t/d
Feed grade0.8-1.5% Cu
Recovery90-95%
Concentrate18-25% Cu

Slow cooling is the whole game

Slag that is quenched fast becomes glass and the copper droplets stay locked at 5-20 micron, which is a flotation problem nobody solves economically. Slag cooled slowly in a pit over 24-48 hours crystallises into fayalite and magnetite with copper sulphide grains of 50-200 micron. The difference in recovery between the two is 40 percentage points.

CoolingCopper grain sizeGrind requiredRecovery
Water quench5-20 micronBelow 20 micron55-70%
Pit, slow air cool50-200 micron75-150 micron90-95%
Launder with heat recovery80-250 micron100-150 micron90-95%, plus steam

Process flow

Slag pitJaw crusherCone crusherBall MillClassifierRougher flotationCleanerConcentrate thickenerTailings

Crushing and grinding

Slag lumps are hard and abrasive: a jaw crusher to 100 mm, a cone crusher to 15 mm, then a ball mill in closed circuit with a classifier to 80% passing 75 micron. Wear is the dominant cost: liners and balls last 40-50% as long as they would on a typical porphyry ore, and the mill power is 10-15% higher because slag is dense at 3.4-3.8 g/cm3.

Flotation

Rougher flotation with xanthate at pH 10-11, two stages of cleaning and one scavenger. Copper in slag is mostly present as fine matte droplets and as dissolved copper in the glassy phase, so the recovery ceiling is set by the cooling history rather than by the reagent scheme. Concentrate at 18-25% Cu returns to the smelter, which closes the loop with almost no transport cost.

Tailings as a product

After copper removal the tailings are an iron silicate with 40-45% Fe, and they sell as blasting abrasive (a direct substitute for copper slag abrasive, which is the same material), as rail ballast, and as a fine aggregate for asphalt. An operation that treats tailings as waste disposes of a product.

Equipment list

StageEquipmentSpecification
PrimaryJaw crusherTo 100 mm, 500 t/d
SecondaryCone crusherTo 15 mm
GrindingBall mill 2.4 x 8 m + classifier80% below 75 micron
FlotationRougher, scavenger, 2 cleanerspH 10-11
DewateringThickener + filter pressConcentrate 12% moisture
TailingsDewatering screen or filterFor sale as abrasive

Magnetite is a second revenue stream

Copper slag contains 8-15% magnetite, and much of it is liberated at the same grind. A low-intensity magnetic separation stage downstream of the copper circuit recovers a magnetite concentrate at 60-65% Fe which sells to the cement industry for heavy-media and iron correction, or back to the concentrator. The capital is one drum separator; the payback is usually under a year.

Questions we are asked before quoting

What copper grade in slag makes recovery worthwhile?

0.5% is the practical floor at current prices and power costs. Below that the grinding energy exceeds the metal value.

Can I float slag and ore in the same circuit?

Not recommended. The density difference changes the pulp rheology and the reagent consumption, and slag contaminates the ore concentrate with silica.

Other solution categories

Same engineering team, different process route.

Send your material. We will send the flow sheet.

Feed size, moisture, target capacity and product spec are enough to start. Quotations and plant layouts are free and usually back within one working day.

Request a flow sheet WhatsApp us