Gold Ore CIL Plant (Carbon-in-Leach)
Carbon-in-leach cyanidation for small and medium gold plants: carbon added directly to the leach tanks, fewer tanks, 90-95% recovery and lower capital cost than CIP.
See the process
Every route below is built from equipment we manufacture in our own workshops, with the layout, foundation plan and commissioning included in one scope.
Carbon-in-leach cyanidation for small and medium gold plants: carbon added directly to the leach tanks, fewer tanks, 90-95% recovery and lower capital cost than CIP.
See the process
Carbon-in-pulp cyanidation for oxide and free-milling gold ores: 8-24 hour leach, carbon in the pulp, 92-96% recovery from a 2-8 g/t feed at 300-800 t/d.
See the processNo two deposits behave the same. Every route starts with a test on your own material, not a catalogue assumption.
20–50 kg sample tested for hardness, moisture, liberation size and abrasion index. You receive the report either way.
Two or three workable flows compared on recovery, reagent and power consumption, then narrowed to one.
Equipment list, mass balance, 2D/3D layout, foundation loads and utility requirements.
Supervision, commissioning, operator training and a wear-parts plan for the first two years.
Reply within one working day, in English, Spanish or Russian. Layouts and quotations are free.