Cone Crusher
Cone crusher for metallurgy, construction, road and silicate plants — hydraulic cavity clearing, uniform product, high throughput. Ask for a quote and price.
View specifications
Manufactured in-house
Photographed at our Zhengzhou works — optional equipment may be shown.
Double roller crusher for medium-hard rock, coal and coke — adjustable product size, few fines, easy roll replacement. Tell us your material and capacity.
The 2PG double roller crusher reduces material between two counter-rotating rolls. Product size is set by the gap between the rolls, and the rolls can be smooth for fine reduction or toothed for coarse, shearing breakage of coal, coke and shale.
Feed drops into the gap between the rolls and is gripped and crushed as the rolls turn toward each other. One roll is fixed and the other is mounted on springs or a hydraulic ram, so unbreakable material passes without stalling the drive. Roll gap adjustment changes the product size without changing parts.


Secondary and tertiary reduction of coal, coke, limestone, shale, clay, bauxite and slag, and preparation of samples and small-tonnage product streams.


Figures refer to standard configurations. Custom feed size, voltage and liner material available on request.
| Model | Roll dia.×width (mm) | Max. feed (mm) | Product (mm) | Capacity (t/h) | Power (kW) |
|---|---|---|---|---|---|
| 2PG400×250 | 400×250 | ≤25 | 0–8 | 5–10 | 5.5×2 |
| 2PG600×400 | 600×400 | ≤35 | 0–10 | 15–25 | 15×2 |
| 2PG750×500 | 750×500 | ≤40 | 0–10 | 25–40 | 22×2 |
| 2PG900×700 | 900×700 | ≤50 | 0–10 | 45–70 | 37×2 |
| 2PG1200×1000 | 1200×1000 | ≤60 | 0–10 | 80–120 | 75×2 |
Every unit is assembled and run under load before dispatch, with a signed test report and photo record.
Foundation plan, load data, wiring diagram and utility requirements, issued in DWG and PDF.
Our supervisor attends erection and start-up, then trains your operators on site for 7–14 days.
One year of recommended spares shipped in the same container, plus a two-year replenishment plan.
Capacity, fineness and power consumption confirmed in the contract and verified at start-up.
Video and data review within 4 working hours for any operating issue during the warranty period.
Tell us the throughput you need (t/h), the feed size and the finished mesh. We will size the Double Roller Crusher for your duty and return a quotation with drawings within one working day.