Mineral Processing · Process route

Bauxite Washing and Beneficiation Line

Reviewed 2026-11-27 Bellian Process Engineering

Reactive silica is what makes bauxite expensive to refine. Scrubbing, screening and desliming to lift the alumina-to-silica ratio before the Bayer circuit sees the ore.

Bauxite Washing and Beneficiation Line

Bauxite is not sold on alumina content alone. A refinery buying ore at 55% Al2O3 with 4% reactive silica loses more soda in the digestion circuit than it saves on the ore price. The metric that governs the transaction is the alumina-to-silica ratio, and washing is the cheapest way to move it: 60-75% of the reactive silica in a typical diasporic bauxite sits in the clay fraction below 1 mm, which can be removed with water and a screen.

Capacity200-1,500 t/d
Al2O355-65%
A/S ratio5-10 after washing
Silica removed40-70%

What the refinery actually penalises

ComponentTypical run-of-mineSaleable targetWhy
Al2O350-60%Above 55%Yield per tonne of ore
Reactive SiO24-9%Below 4%Each 1% consumes 10-15 kg soda per tonne
Fe2O35-25%Below 20%Red mud volume and disposal cost
Moisture8-15%Below 10%Freight is paid on water

The A/S ratio is the shorthand: Al2O3 divided by reactive SiO2. Below 7 the Bayer process becomes uneconomic for most refineries; above 10 the ore commands a premium. Washing typically lifts the ratio by 1.5-3 points, which is often the difference between a sellable and an unsellable ore.

Process flow

Run-of-mineHopper and feederScrubberWet screenCycloneDewatering screenProductTailings thickener

Scrubbing is the key unit

Bauxite clay does not disperse in a simple wash. An attrition scrubber at 40-60% solids with 8-12 minutes residence breaks the clay coating off the pisolitic nodules, which is what releases the silica into the fine fraction. A plant without a scrubber and with only a spray screen recovers 20-30% of the available silica reduction; with a scrubber it recovers 55-70%.

Screening and desliming

A wet vibrating screen at 1-2 mm separates the washed coarse product from the clay slurry. The cut point matters: a 1 mm cut removes more silica but loses more alumina fines with it. Most operations run at 1.5 mm and accept 3-5% alumina loss to the tailings.

Water and tailings

Washing consumes 1.5-3 m3 of water per tonne of ore, and the resulting slime is the hardest part of the plant to permit. A thickener with high-rate flocculation plus a filter press returns 85-90% of the water and produces a stackable cake. Red mud from the refinery is a separate problem, but the washery slime is often the first environmental objection to a new mine.

Equipment list

StageEquipmentSpecification
FeedingApron feeder + grizzly800 t/d, 600 mm lumps
CrushingRoll crusher or sizerTo 100 mm
ScrubbingAttrition scrubber 2.4 m8-12 minutes residence
ScreeningWet vibrating screen1.5 mm cut
ClassificationHydrocyclone cluster75 micron overflow
DewateringDewatering screen + thickenerProduct below 12% moisture
WaterFilter press on tails85-90% recovery

When washing is not enough

For high-silica diasporic ores the clay fraction is only part of the problem — the silica is also locked inside the nodules as kaolinite inclusions and as aluminosilicate in the matrix. Two further routes exist. Magnetic separation removes iron-bearing minerals but does little for silica. Flotation of the diaspore from kaolinite with a collector at pH 9-10 works in the laboratory and has been piloted at scale, but the reagent cost is high and the selectivity is sensitive to the ore. For most operations the practical answer is selective mining and blending rather than a complex concentrator.

Questions we are asked before quoting

Can I wash bauxite without a scrubber?

You can, and you will remove 20-30% of the silica instead of 60%. If the ore already meets the refinery's ratio, no scrubber is needed; if it does not, the scrubber is the plant.

What moisture does the product need?

Below 10% for sea freight, because the cargo liquefaction risk above that is a shipping hazard, not just a cost issue. Most contracts specify a transportable moisture limit and test it every shipment.

Other solution categories

Same engineering team, different process route.

Send your material. We will send the flow sheet.

Feed size, moisture, target capacity and product spec are enough to start. Quotations and plant layouts are free and usually back within one working day.

Request a flow sheet WhatsApp us